• Occupier: MVV Environment Ltd.
  • Size: 5,155 sq m / 55,488 sq ft
  • Completion Date: 01/11/2016
  • Sector: Energy & Waste

UMC Architects were design team leader and coordinator for a £37.5m waste wood biomass facility at Ridham Dock in Kent for MVV Environment Ltd.

The facility has an annual capacity of 172,000 tonnes and a net capacity of 25MW of power and up to 35MW of low-grade steam heat. UMC Architects worked alongside Clugston Construction and CNIM technology contractor, leading the design coordination with Arup and LX Engineering.