occupier
Vital Energi
location
Drakelow
size
11,110 m² / 119,585 ft²
status
Completed
Service
Sector
The plant will use around 169,000 tonnes of Biomass Rich Fuel, a form of Refuse Derived Fuel that requires no onsite processing. It will utilise a gasification technology to produce a syngas that will be used to generate electricity onsite using a steam turbine. Generated electricity will be exported to grid and the plant has been designed to be CHP ready so that future development on the adjacent Drakelow Park site could readily make use of generated heat.
The architectural design has been delivered in BIM, with UMC acting as Architect / Lead Designer and coordinating the general building modelling (along with fire engineering and approved inspector interfaces), and with MJM acting as Structural and Civil Engineers.
Other spaces where we’ve defined a plan and brought it to life.
Amazon EMA4, Peddimore
View ProjectOur process
We help you turn your ideas into a clear plan to create a space that is uniquely yours.
Time to bring your vision to life.
We would love to hear from you.
Start with an email, and we’ll be in touch