UMC Architects were engaged by Winvic Construction, to assist with the detailed design of this chilled warehouse, located at Berth 45, Port of Tilbury.
The new facility will offer short-term storage for imported foodstuffs, as soon as they arrive by seafreight. A chilled warehouse area of 219,000sq.ft is served by 25 dock levellers and 1 level access door. Ancillary mezzanine offices of 17,000sq.ft are located over the loading areas, to maximise the storage volume on a very tight site.