Tilbury Port Chilled Warehouse Completed

UMC Architects were engaged by Winvic Construction, to assist with the detailed design of this chilled warehouse, located at Berth 45, Port of Tilbury.

The new facility will offer short-term storage for imported foodstuffs, as soon as they arrive by seafreight. A chilled warehouse area of 219,000sq.ft is served by 25 dock levellers and 1 level access door. Ancillary mezzanine offices of 17,000sq.ft are located over the loading areas, to maximise the storage volume on a very tight site.

UMC ARCHITECTS 2024 |